Demonstration was held with Samjin heavy-duty hammer grab
Demonstration meeting for Samjin heavy-duty hammer grab
On Sep.7 2013, in Shirai, Chiba, there were over 30 people attended to the demo.
Features:
- 2000-3000mm in diameter piling works can be done with one body and shells (2000, 2300, 2500,2800,3000)
- 32mm wire for heavy-duty crane
- Independent big-size sheaves (D=550mm) adapted
- 18-28t swivel can be used with its wide inner diameter inside crown
- Shell edge (Hardox) can be replaced (no need to change whole shell)
- Good water penetration
- Noise absorption system